Main Panel Upgrade

Project Location : El Cajon, CA

Project Overview

Improving Safety, Capacity, and Code Compliance

Benson Electric upgraded a residential main electrical panel in El Cajon following an HOA-mandated safety review. The existing panel contained Stab-Lok and Pushmatic breakers—now recognized as major fire hazards. Our team replaced the panel with a solar-ready 200-amp system and brought the home into full NEC compliance.

What We Did

Old Panel Removed

  • Hazardous Stab-Lok/Pushmatic panel removed

New System Installed 

  • 200-amp main panel, solar-ready
  • Two new ground rods added
  • Cold water system bonded to electrical system

Key Discovery:

  • Home was missing proper bonding, a critical safety flaw

Why Bonding Matters

We ensured the home met NEC Article 250 standards. Proper bonding:

One-Day Installation Timeline

We coordinated with SDG&E for a seamless, same-day upgrade

Why This Upgrade Matters

This upgrade offers the homeowner:

Start Your Electrical Project with Confidence

We make it easy to get started. Just fill out the form below and we’ll reach out to confirm your project details and schedule your service.

Contact Us